FREE QUOTATION

  • Sign In
  • Create Account

  • My Account
  • Signed in as:

  • filler@godaddy.com


  • My Account
  • Sign out

Signed in as:

filler@godaddy.com

  • Home
  • CURRENT PROJECTS
  • Finished Projects
  • Project Stages
  • Gallery
  • Our partners
  • Testimonials
  • Contact Us
  • Projects

Account


  • My Account
  • Sign out


  • Sign In
  • My Account

All projects are finished in the high standard of work.

Request a Quote

CURRENT PROJECTS

Project Preston PR1

In Preston PR1, ground floor refurbishment involves electrical and plumbing work, ceiling insulation, and installing new PVC windows and door frames. Reception rooms will undergo similar procedures. The kitchen will see improvements in electrical and plumbing systems, cleaning, wall-fixing, new door installation, décor, vinyl flooring. Attention to detail is a priority. On the first floor, refurbishment focuses on detailed improvements. This includes plumbing and electrical work, plasterboard installation, painting, wood ornamentation, and new skirting boards. Bedrooms and the bathroom undergo similar operations. General enhancements include installing gates, changing locks, tidying the garage and yard, and adding a PVC window. Full rewiring, boiler testing, contemporary decorating, and modern vinyl flooring are part of the project. The project is expected to take five to seven weeks, ending with thorough cleaning and a 12-month guarantee.

Project Liverpool L4

The Liverpool L4 Project involves the careful renovation of 3 apartments and communal hallway. In Flat I, renovations focus on the entrance hallway, bathroom, bedrooms, and kitchen/lounge, with structural improvements and aesthetic enhancements. Flat II's plan emphasizes modernizations in the bathroom and kitchen/lounge. Flat III's restoration prioritizes the kitchen/lounge, bedrooms, bathrooms, and entry hallway, aligning with the building's commitment to both aesthetics and structure. 

Tasks in communal hallway include removing existing electric features, comprehensive first and second fix electrical work, wall repairs, and installing fire-rated skirting boards and handrails meeting regulatory standards.

The project aims for a comprehensive transformation, with guaranteed installation and meticulous final cleaning. There is a big expectation for the outcome as all apartments will be used as for serviced accommodation.

Project Liverpool L6

The property requires various maintenance tasks primarily focused on the entrance hallway and individual flats. In the entrance hallway, adjustments to the front doors are necessary to prevent catching on the frame. Across Flats 1-6, tasks include removing and disposing of existing shower doors and silicone, installing new shower doors and silicone, reattaching existing vinyl flooring, and painting skirting boards. Specific tasks for individual flats include completing silicone work, replacing damaged floor strips, and adjusting fire doors to eliminate door gaps. Flat 6 presents a unique challenge with the shower door frame requiring ceiling attachment, necessitating removal and installation of plasterboard. The service includes a 12-month guarantee on shower door installations, rubbish removal, and an estimated duration of 3-4 days. 

Project Wallasey CH44

The property renovation involves clearing the front area and refurbishing multiple rooms. This includes removing old flooring, wallpaper, and fixtures, then installing new ones. Bedrooms are getting en-suites, modern fittings, and fire-resistant doors. The kitchen and dining area will be updated with new appliances and tiles. Throughout, attention will be paid to insulation and soundproofing. Outside, the back area will be cleared, a new gate installed, and the shed checked. The project aims for compliance with safety regulations and is expected to take around 11-12 weeks.

Project Liverpool L26

The property renovation project involves extensive refurbishment across both the ground and first floors. Beginning with the ground floor, tasks include electrical first and second fixes, insulation installation, plasterboard fitting, ceiling skimming, and decoration in various rooms like the entrance hallway, front bedroom, living room, kitchen, and utility room. The first floor requires similar treatments along with additional tasks such as carpet removal, stud wall construction, plumbing checks and fixtures, and the installation of doors, radiators, and skirting boards in multiple bedrooms and a bathroom. The master bedroom also entails en-suite refurbishment with tiling, basin sink installation, and wall fixing. General aspects encompass pricing negotiations, electrical certifications, potential additional repairs, roofing work, and a 12-month guarantee on installation. The project is estimated to last 6-7 weeks, with the client responsible for organizing cleaning upon completion.

Copyright © 2025 OSAH PROPERTY SOLUTION LTD - All Rights Reserved.

Powered by

  • Privacy Policy

UPGRADE YOUR PROPERTY WITH OSAH!

Whether it's a small or large one, 

we cover all aspects of the property. 

GET A FREE QUOTE

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

DeclineAccept